Sealey YK209F Manuale Utente Pagina 2

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 4
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 1
3.1 YK209F.V2 20TONNE PRESS ASSEMBLY (use the exploded diagram Fig.4 as a guide to assembly as well as the diagrams
below).
3.1.1. The bed frame is put in the bottom of the crate for transport, fix it to the uprights using bed frame pin (9) and circlip (10).
3. ASSEMBLY
3.1.2. Attach the base section (1) and support pieces (3) to both the frame uprights, using bolt (2), washer (4), lock washer (5) and nut (6). Refer
tog.1.
3.1.3. Move the pump assembly to the outside of the post, secure using bolt (37) and washer (4), which held the pump to the inside of the post
duringtransit.Refertog.2.
3.1.4. Assemblethegaugetting(31)thenylonring(32),(whichtsbetweenthegaugeandthegaugettingseeg.4),andthegauge(33).
Twistthegaugeastightaspossibletopreventitfromleaking.Thenthegaugeandgaugettingarettedtothemanifold(24).
Fig.1
Fig.2
Fig.3
Vedere la pagina 1
1 2 3 4

Commenti su questo manuale

Nessun commento